Homework after Session 7: the integration stretch
Time: spread across the gap, one stage per session. Last build stretch: the remaining web and wiring stages, solo, and next session is the gate.
-
Finish the web and wiring roadmaps. One stage per session, same rhythm as in the last session, one addition:
/context-restore → build the stage from
plans/roadmap-web.md→ /qa → evidence, not "done!" → commit → /sync-gbrain → /context-save -
Smoke-test across platforms, every session. Thirty seconds before you close: add an item on the phone, see it in the browser; change it in the browser, see it on the phone. Integration rots quietly, catching it the session it breaks is cheap; finding it at the gate is not.
-
Keep
LOG.mdgoing, one line per session,bugs:lines with cause-sentences./investigateremains your debugger; the escalation protocol still stands (30 minutes stuck → message your tutor with your save-summary and a specific question). If the app vanishes off your phone again: Xcode, re-run, re-signed. -
Live with the whole product. Your kitchen has an app and your household has a URL. Use both right through the stretch. The spec-was-wrong list keeps growing; keep not fixing it. Exceptions, not edits.
-
Before Session 8, once: run /document-generate: "write the missing documentation for this project", and just commit what it drafts. Next session builds the handover pack from that draft; arriving with it written is the difference between a graduation and a scramble.
Definition of done before the next session: all three roadmaps complete, the
cross-platform smoke test passing, LOG.md current, and the
documentation draft committed.